CWM8180
| Image | Product | Code | Price | |
|---|---|---|---|---|
|
|
DS8S/SCMS Tweeter | ZZ14345 | € 93,11 each | This product has a longer delivery time |
|
|
CWM8180 Midrange | LF01026 | € 175,86 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180 Bass Unit | LF00549 | € 201,73 each | No stock |
|
|
CWM8180/CWM DS8/ISW4 Grille | ZG02740 | € 51,73 each | This product has a longer delivery time |
|
|
ISW4 Frame | ZZ15013 | € 67,24 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180 HF/MF Crossover | XX14568 | € 118,96 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180 LF Crossover | XX14615 | € 108,62 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180/DS8/ISW4 Cutout Template | TT73345 | € 10,33 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180/DS8/ISW4 Paint Mask | TT73359 | € 10,33 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180/Signature 8NT Midrange/Tweeter Baffle | BB13042 | € 124,13 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180 Baffle | BB11541 | € 191,37 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
CWM8180/DS8/LCR8 Baffle Screw | HH10952 | € 7,11 each |
This item is ordered from the manufacturer; delivery times vary from 2 weeks to 12 weeks. |
|
|
Signature 8NT/CWM8180 Tweeter Tube | MM01767 | € 10,33 each | This product has a longer delivery time |
|
|
Back Box Cable Entry Gland | HW00130 | € 4,40 each | This product has a longer delivery time |
|
|
Back Box Rubber Grommet | HW00131 | € 1,17 each | This product has a longer delivery time |